2024
DOI: 10.1038/s41598-024-60325-x
|View full text |Cite
|
Sign up to set email alerts
|

Stress and deformation analysis of the steel pipe arch integral lifting construction process of a continuous beam arch bridge

Hui Xiang,
Dadong Xia,
Sheng Wang
et al.

Abstract: The Changjinghuang Railway Xinjiang Xizhi Bridge is a (90 + 180 + 90) m continuous beam arch bridge, and the arch rib steel pipe installation adopts “short bracket assembly and overall lifting method”. In order to ensure the accuracy of closure, the stress and deformation of the arch rib and bracket must be strictly controlled. Midas Civil is used to establish the finite element model to simulate the overall lifting construction process of the arch rib. Based on the model, the stress and deformation of the arc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 11 publications
0
0
0
Order By: Relevance