Stress and displacement analysis of aerial oil & gas pipelines: A case study of Lantsang tunnel crossing project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
3
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…Furthermore, to obtain the pipe strain accurately and quickly under different working conditions, numerical methods are also generally used by researchers. Lu 13 used CAESAR II software to establish the stress analysis model of the tunnel pipeline, and obtained the critical section position of the natural gas, crude oil, and product oil pipeline crossing the tunnel and the main load affecting the stress. Liu et al 14 analyzed the pipeline strain response under a combination of compression and bending load when the X80 pipeline crossed the strike–slip fault and proposed a semiempirical model for peak strain prediction.…”
Section: Introductionmentioning
confidence: 99%
“…Furthermore, to obtain the pipe strain accurately and quickly under different working conditions, numerical methods are also generally used by researchers. Lu 13 used CAESAR II software to establish the stress analysis model of the tunnel pipeline, and obtained the critical section position of the natural gas, crude oil, and product oil pipeline crossing the tunnel and the main load affecting the stress. Liu et al 14 analyzed the pipeline strain response under a combination of compression and bending load when the X80 pipeline crossed the strike–slip fault and proposed a semiempirical model for peak strain prediction.…”
Section: Introductionmentioning
confidence: 99%
“…In order to ensure the safety of metro tunnel construction and reduce the impact on existing buildings (structures) and traffic lines, relevant scholars have conducted a lot of research studies on metro tunnel underpassing projects and corresponding control measures [10][11][12]. Lu [13] used the CAESAR II software to establish the stress analysis model of Yanyingshan tunnel pipeline based on the Lantsang tunnel crossing pipeline project and studied the change law of pipeline stress state and displacement during tunnel construction. Liu et al [14] used the MIDAS/GTS NX finite element software to analyze the impact of shield tunnel construction on the existing railway by taking Zhengzhou metro line 4 under the Longhai railway as an example.…”
Section: Introductionmentioning
confidence: 99%
“…These investigations mainly analyzed the structural failure of a NGTP damaged by a third party in the tunnel excavation process. At the same time, the software CAESAR II has been used to investigate the structure failure of NGTPs in the literature ( 12 , 13 ). The influence of the main load was obtained for the stress of the NGTP.…”
mentioning
confidence: 99%