All Days 2013
DOI: 10.2118/167128-ms
|View full text |Cite
|
Sign up to set email alerts
|

Stress Shadow Evaluations for Completion Design in Unconventional Plays

Abstract: In horizontal well shale completions, multiple stages, each often with multiple clusters, are used to provide sufficient stimulated area to make an economic well. However, each created hydraulic fracture alters the stress field around it, and when hydraulic fractures are placed close enough together, the well-known stress shadow effect occurs in which subsequent fractures are affected by the stress field from the previous fractures. Further, new completion techniques, like simultaneous fracturing and zipper fr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0
1

Year Published

2016
2016
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 36 publications
(13 citation statements)
references
References 3 publications
0
12
0
1
Order By: Relevance
“…The "Western Zone" may represent further hydraulic fracture development; however, it is not clear why there is a gap in hydraulic fracture growth between the point of injection and this westward zone. This could be the result of a stress shadow forming from the opening of fractures in the central NS zone (Nagel et al, 2013;Kettlety et al, 2020).…”
Section: Manuscript For Submission To Srlmentioning
confidence: 99%
“…The "Western Zone" may represent further hydraulic fracture development; however, it is not clear why there is a gap in hydraulic fracture growth between the point of injection and this westward zone. This could be the result of a stress shadow forming from the opening of fractures in the central NS zone (Nagel et al, 2013;Kettlety et al, 2020).…”
Section: Manuscript For Submission To Srlmentioning
confidence: 99%
“…现在的同步压裂完井、拉链式 压裂完井都是利用了应力阴影效应形成网络裂缝 [12] . 应力阴影效应同时也会导致后续压裂裂缝净压力升 高、裂缝宽度变窄, 不利于裂缝延伸发展 [13,14] . 对于分 段压裂多条平行裂缝的情况, 曾顺鹏等人 [15] [3] .…”
Section: 水平井多簇多段压裂是高效开发页岩气储层的 技术手段 然而每条裂缝会使它周围的应力场发生改unclassified
“…18. The directions of the major axes of the ellipses in the plane of the hydraulic fracture, are offset by an angle, which is another indication of interaction between the fractures and the ''stress shadow'' effect [24]. The case with three clusters within the stage also was simulated in the model with the fracture network that was explicitly represented.…”
Section: Example Applicationmentioning
confidence: 99%