2020
DOI: 10.1016/j.engfailanal.2020.104594
|View full text |Cite
|
Sign up to set email alerts
|

Structural integrity assessment of shield tunnel crossing of a Railway Bridge using orthogonal experimental design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 34 publications
(10 citation statements)
references
References 5 publications
0
10
0
Order By: Relevance
“…In [18], the indicators and standards suitable for engineering risk assessment have been proposed. (e absolute value of direct economic losses is used as an assessment standard for harmfulness, which is not applicable to the risk assessment of small and medium structures with low cost.…”
Section: Risk Matrix Expansionmentioning
confidence: 99%
“…In [18], the indicators and standards suitable for engineering risk assessment have been proposed. (e absolute value of direct economic losses is used as an assessment standard for harmfulness, which is not applicable to the risk assessment of small and medium structures with low cost.…”
Section: Risk Matrix Expansionmentioning
confidence: 99%
“…During shield excavation, the stress of the soil near the excavation face will be changed. This causes the overall settlement of the existing building foundation, differential settlement of the foundation sections, and the associated external risks (Baoyun Zhao et al 2020). According to the Hangzhou subway construction and protection regulations, the maximum surface settlement corresponding to the quasi-rectangular shield tunneling project should be controlled within 18 mm, and the maximum surface uplift should be controlled within 5 mm.…”
Section: Environmental Control Standardmentioning
confidence: 99%
“…With the development of urban metro construction and commercialization in downtown areas, the crossing of metro tunnels is frequently encountered in geotechnical engineering practice. e construction of newly built tunnels will inevitably bring great risks to existing operating tunnels and even result in serious engineering accidents and economic losses [1,2]. e in uence of tunnel construction on the existing metro tunnel structure is mediated by the soil layer and groundwater during the process of the new metro tunnel passing through existing operational tunnels.…”
Section: Introductionmentioning
confidence: 99%