2011 International Conference on Electrical and Control Engineering 2011
DOI: 10.1109/iceceng.2011.6057096
|View full text |Cite
|
Sign up to set email alerts
|

Study and implementation of grounding insulation resistance detection system for the solar inverter

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…BTX-ARX and BRX-ATX signals are connected to CPUB to implement the communication between the two CPUs. J3 is the Human-Machine interface of the system, and it can connect with an external serial port LCD, three keys, a status indicator LED and a buzzer if necessary [9]. The seven-channel output signals of CPUB interface circuit, as is shown in fig.…”
Section: Design Of Control Circuitmentioning
confidence: 99%
“…BTX-ARX and BRX-ATX signals are connected to CPUB to implement the communication between the two CPUs. J3 is the Human-Machine interface of the system, and it can connect with an external serial port LCD, three keys, a status indicator LED and a buzzer if necessary [9]. The seven-channel output signals of CPUB interface circuit, as is shown in fig.…”
Section: Design Of Control Circuitmentioning
confidence: 99%