2009
DOI: 10.1016/j.fusengdes.2009.01.045
|View full text |Cite
|
Sign up to set email alerts
|

Study of ITER equatorial port plug handling system and vacuum sealing interface

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…Due to architectural variations, particularly in the UP, certain RM strategies cannot be implemented. However, the cask and plug remote handling system is designed for ITER [9], and some RM maintenance strategies could be considered [10].…”
Section: Rm Function Requirementsmentioning
confidence: 99%
“…Due to architectural variations, particularly in the UP, certain RM strategies cannot be implemented. However, the cask and plug remote handling system is designed for ITER [9], and some RM maintenance strategies could be considered [10].…”
Section: Rm Function Requirementsmentioning
confidence: 99%
“…a) The (bolted) double flange [16] is a kind of frame consisting of an additional flange on the VV side and a flange on the PP side that are connected with a somewhat elastic sheet metal bend. A double spring-loaded C-ring seal with intermediate vacuum between seals this frame to the VV and to the PP.…”
Section: Application Of Iter Solutionsmentioning
confidence: 99%
“…), the rescue of such a complex system might be impossible in the tight environment of a cask. Recent design progress has been made in order to provide passive guiding features for the plug and avoiding cantilevered loads on the tractor [5]. For removal, the plug cantilever load is transferred to the port floor rails through wheels (or skids).…”
Section: Plug Handlingmentioning
confidence: 99%