Study of Kalina cycle as waste energy utilization system in Wayang Windu geothermal power plant

Abstract: Abstract. We present the study of electricity generation by utilization of the Kalina cycle system (KCS) as a bottoming cycle in the Wayang Windu geothermal power plant. The KCS converts the thermal energy from the waste brine discharged to the earth crust as a heat source. Based on the brine temperature condition, KCS 11 is the most suitable system among others owing to excellent performance at low to mid-regime temperatures. The constraints of the investigation are focused on the consideration of minimum sil… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…The brine waste characteristics of the Wayang Windu geothermal field separator have a temperature of 180.7 o C and a flow rate of 48 kg/s [13]. The minimum temperature is using to prevent fouling of the heat exchanger.…”
Section: Geothermal Power Plant Brinementioning
confidence: 99%
See 1 more Smart Citation
“…The brine waste characteristics of the Wayang Windu geothermal field separator have a temperature of 180.7 o C and a flow rate of 48 kg/s [13]. The minimum temperature is using to prevent fouling of the heat exchanger.…”
Section: Geothermal Power Plant Brinementioning
confidence: 99%
“…The minimum temperature is using to prevent fouling of the heat exchanger. According to [13] the minimum temperature for using a brine in Wayang Windu is 113 C. Wayang Windu produced almost dry steam with the quality above 97%. While treating the brine as a waste by directly injected it into the injection wells is safer and simpler for geothermal companies, but it is wasting the heat energy potential that is contained in the brine.…”
Section: Geothermal Power Plant Brinementioning
confidence: 99%