This paper describes the Measurement Management Criteria (MMC) of a soil slope failure based on displacement using literature reviews, small-scale experiments, large-scale experiments, and field data. Two types of measurement management criteria were developed, i.e., short-term criteria for slopes under construction or requiring urgent measurements, and long-term criteria for slopes under continuous management. First, the measurement criteria for the short term were determined based on small- and-large scale experiments, and were determined to be “1 mm/min for the watch level,” “4 mm/min for the caution level,” and “21 mm/min for the alert level.” Next, the criteria for the long term were determined through a literature review and field data, and were “2 mm/day for the watch level,” “8 mm/day for the caution level,” and “56 mm/day for the alert level”.