2021
DOI: 10.5604/01.3001.0015.2715
|View full text |Cite
|
Sign up to set email alerts
|

Study of Parameters Influencing the Production and Improvement of the Launch System in a Production Department: Case Study in the Clothing Industry in Tunisia

Abstract: This study was carried out in a clothing company to determine the parameters that influence the decline in production. The results showed that the parameter “Machine failures” had a 34.6% effect on production, and “lack of versatility” 19.7%, while the parameter “heavy launch” had an effect of 17.1%, “lack of supplies” 9%, touch-ups 3%, and “lack of cut parts” 2%. Indeed, the application of lean and six sigma tools and especially the D.M.A.I.C and TPM methods are two tools that improve efficiency and productiv… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
4
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 20 publications
0
4
0
Order By: Relevance
“…The 1 st floor -current workflow OPERATION NO PROCESSES (15) Pieces come from basement are placed to the sorting table (15)(16) From sorting table to the Operator-A for attaching the ornament tag (16)(17) Then pieces come to the Operator-B for attaching the washing instructions and send to sorting table back (15)(16)(17)(18) Front pieces come from the sorting table to Operator-C for preparation of fly tips (18)(19) The pieces are brought to the Operator-D for fly overcast (19)(20) The Operator-C gets pieces for the fly and zipper seam (20)(21) The pieces are brought to the Operator-F for fly place marking (handwork) (21)(22) After the marking processes, pieces are sent to the Operator-G for attaching fly to the body pieces (22-23) (15)(16)(17)(18)(19)(20)(21)(22)(23) Front pieces are brought to the Operator-H for shoulders combining process. At the same time, the back pieces that are waiting on the sorting table are brought to the Operator-H as well for the same process (23)(24) The pieces are sent to the Operator-I for shoulder flatlock stitches (24-25) (15)(16)(17)(18)(19)(20)(21)(22)(23)(24)(25) Pieces then comes to the Operator-J and at the same time the collar pieces are brought for collar preparation process (25-26) After the preparation process, pieces are brought to the Operator-K for collar attaching (26-27)…”
Section: The 1 St Floormentioning
confidence: 99%
See 3 more Smart Citations
“…The 1 st floor -current workflow OPERATION NO PROCESSES (15) Pieces come from basement are placed to the sorting table (15)(16) From sorting table to the Operator-A for attaching the ornament tag (16)(17) Then pieces come to the Operator-B for attaching the washing instructions and send to sorting table back (15)(16)(17)(18) Front pieces come from the sorting table to Operator-C for preparation of fly tips (18)(19) The pieces are brought to the Operator-D for fly overcast (19)(20) The Operator-C gets pieces for the fly and zipper seam (20)(21) The pieces are brought to the Operator-F for fly place marking (handwork) (21)(22) After the marking processes, pieces are sent to the Operator-G for attaching fly to the body pieces (22-23) (15)(16)(17)(18)(19)(20)(21)(22)(23) Front pieces are brought to the Operator-H for shoulders combining process. At the same time, the back pieces that are waiting on the sorting table are brought to the Operator-H as well for the same process (23)(24) The pieces are sent to the Operator-I for shoulder flatlock stitches (24-25) (15)(16)(17)(18)(19)(20)(21)(22)(23)(24)(25) Pieces then comes to the Operator-J and at the same time the collar pieces are brought for collar preparation process (25-26) After the preparation process, pieces are brought to the Operator-K for collar attaching (26-27)…”
Section: The 1 St Floormentioning
confidence: 99%
“…The pieces are brought to the Operator-T and Operator-V for front foot stitches (32-33) (15)(16)(17)(18)(19)(20)(21)(22)(23)(24)(25)(26)(27)(28)(29)(30)(31)(32)(33) The pieces are brought to the Operator-Y for sorting process. At the same time, sleeves also are brought to this sorting table…”
Section: The 1 St Floormentioning
confidence: 99%
See 2 more Smart Citations