Study of rehabilitation plan of bottom outlet service and emergency gates of Karun 1 dam

Abstract: Rehabilitation and renovation of damaged tunnels and hydro-mechanical equipment of dam and power plant projects in Iran is a major challenge and has to be seriously planned for now. Considering that Karun 1 dam has been in service for more than 50 years, the service and emergency gates of this project showed extensive damage and needed to be replaced. In the absence of a maintenance intake gate in front of this tunnel and the impossibility of emptying the upstream reservoir – whose dependent power plants must … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Considering that the slot's retraction angle is 1 : 12 and W/D � 140/162 � 0.86 and Δ/W � 25/140 � 0.18, the allowable index value is about 0.2, and this index is about 0.79 in Sardab Dam's gate slot. Accordingly, cavitation will not happen in the slot [39][40][41][42].…”
Section: Pressure Values In the Bottom Outlet's Tunnel Of Sardabmentioning
confidence: 99%
“…Considering that the slot's retraction angle is 1 : 12 and W/D � 140/162 � 0.86 and Δ/W � 25/140 � 0.18, the allowable index value is about 0.2, and this index is about 0.79 in Sardab Dam's gate slot. Accordingly, cavitation will not happen in the slot [39][40][41][42].…”
Section: Pressure Values In the Bottom Outlet's Tunnel Of Sardabmentioning