2020
DOI: 10.1051/e3sconf/202017703023
|View full text |Cite
|
Sign up to set email alerts
|

Study of the efficiency of conveyors of mining transport systems of mining complexes

Abstract: The current stage of development of open-pit mining is characterized by mining operations at great depths. Increasing the depth of quarries leads to an increase in the volume and distance of transportation of overburden and ore. Therefore, the task of building energy-efficient transport systems, improving the efficiency of existing belt conveyors of mining transport systems is one of the most urgent tasks. The article examines the efficiency of belt conveyors in mining transport systems mining complexe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 16 publications
(12 citation statements)
references
References 0 publications
0
11
0
Order By: Relevance
“…Higher harmonics (n = 5, 7, 11, 13, etc. ) have a winding factor value much less than unity and its value is close to zero, as a result of which high EDF harmonics (MDF) are significantly reduced [4][5][6][7][8][9][10][11][12][13][14][15]16].…”
Section: Calculation Of the Winding Factor For A Variable Number Of P...mentioning
confidence: 99%
“…Higher harmonics (n = 5, 7, 11, 13, etc. ) have a winding factor value much less than unity and its value is close to zero, as a result of which high EDF harmonics (MDF) are significantly reduced [4][5][6][7][8][9][10][11][12][13][14][15]16].…”
Section: Calculation Of the Winding Factor For A Variable Number Of P...mentioning
confidence: 99%
“…Signals are fed to the control electrodes of the thyristors in the power capacitor circuit through a step-down transformer and a contactless voltage relay. The switching of three-phase capacitor banks as a function of voltage is carried out using two such relays, configured for different operating voltages [3,[28][29].…”
Section: Fig1 Capacitor Bank Power Control Circuitmentioning
confidence: 99%
“…Thyristor compensators can be used effectively in networks with any schedule of changes in reactive load in conjunction with capacitor units unregulated or with step regulation [11,[24][25][26]35].…”
Section: New Solutions For Controlled Compensating Devicesmentioning
confidence: 99%