1974
DOI: 10.1007/bf01117799
|View full text |Cite
|
Sign up to set email alerts
|

Study of the physical characteristics of the BN-350 reactor on starting

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1974
1974
2012
2012

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In addition, some of the most important results of BN-350 operation are [8][9][10][11]: 1) reliability of the full-scale equipment of a power-generating unit operating in a sodium medium (reactor vessel and in-vessel mechanisms, pumps, heat-exchangers, pipelines, and fixtures Du 500 and Du 600, cold traps, and others); the failure of evaporators during the first few years of operations was due to manufacturing defects; 1) perfection of the technology used to prepare large sodium volumes (~1000 m 3 ), preparation of tanks, the reactor vessel, branching pipelines, and other large-size equipment for filling with sodium and the technology for filling the equipment; In addition, some of the most important results of BN-350 operation are [8][9][10][11]: 1) reliability of the full-scale equipment of a power-generating unit operating in a sodium medium (reactor vessel and in-vessel mechanisms, pumps, heat-exchangers, pipelines, and fixtures Du 500 and Du 600, cold traps, and others); the failure of evaporators during the first few years of operations was due to manufacturing defects; 1) perfection of the technology used to prepare large sodium volumes (~1000 m 3 ), preparation of tanks, the reactor vessel, branching pipelines, and other large-size equipment for filling with sodium and the technology for filling the equipment;…”
Section: Phase 3 Task Completion Resultsmentioning
confidence: 99%
“…In addition, some of the most important results of BN-350 operation are [8][9][10][11]: 1) reliability of the full-scale equipment of a power-generating unit operating in a sodium medium (reactor vessel and in-vessel mechanisms, pumps, heat-exchangers, pipelines, and fixtures Du 500 and Du 600, cold traps, and others); the failure of evaporators during the first few years of operations was due to manufacturing defects; 1) perfection of the technology used to prepare large sodium volumes (~1000 m 3 ), preparation of tanks, the reactor vessel, branching pipelines, and other large-size equipment for filling with sodium and the technology for filling the equipment; In addition, some of the most important results of BN-350 operation are [8][9][10][11]: 1) reliability of the full-scale equipment of a power-generating unit operating in a sodium medium (reactor vessel and in-vessel mechanisms, pumps, heat-exchangers, pipelines, and fixtures Du 500 and Du 600, cold traps, and others); the failure of evaporators during the first few years of operations was due to manufacturing defects; 1) perfection of the technology used to prepare large sodium volumes (~1000 m 3 ), preparation of tanks, the reactor vessel, branching pipelines, and other large-size equipment for filling with sodium and the technology for filling the equipment;…”
Section: Phase 3 Task Completion Resultsmentioning
confidence: 99%