2019 IEEE Innovative Smart Grid Technologies - Asia (ISGT Asia) 2019
DOI: 10.1109/isgt-asia.2019.8880807
|View full text |Cite
|
Sign up to set email alerts
|

Study on 24h Dynamic Reactive Power Optimization Considering Safety Operation Limit of Generators

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The static optimization results should be sorted by adjacent times in the method, and the priority order cannot be determined if more than two differences are equal in the sorting reactive power compensators. In article [9], a complete 24-h non-linear mixed integer DRPO mathematical model is established considering the constraints of generator operation and decentralized control variables with global constraints. The interior point algorithm is used to solve the problem.…”
Section: Pre-action Table Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The static optimization results should be sorted by adjacent times in the method, and the priority order cannot be determined if more than two differences are equal in the sorting reactive power compensators. In article [9], a complete 24-h non-linear mixed integer DRPO mathematical model is established considering the constraints of generator operation and decentralized control variables with global constraints. The interior point algorithm is used to solve the problem.…”
Section: Pre-action Table Methodsmentioning
confidence: 99%
“…To address the problem of DG integration of the distribution network, article [8] proposed a sensitivity‐based relaxation and decomposition method for DRPO to coordinate continuous and discrete reactive power compensators. In article [9], a complete 24‐h non‐linear mixed integer DRPO mathematical model is established considering the constraints of generator operation and decentralized control variables with global constraints. The interior point algorithm is used to solve the problem.…”
Section: Introductionmentioning
confidence: 99%