2003
DOI: 10.1016/s0886-7798(03)00036-1
|View full text |Cite
|
Sign up to set email alerts
|

Study on design and construction method for the New Tomei–Meishin expressway tunnels

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2012
2012
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 24 publications
(9 citation statements)
references
References 0 publications
0
9
0
Order By: Relevance
“…In this section, the final values of the major and minor axes and the ratio of horizontal over vertical stresses k are the same as in the previous section with the end time of excavation being t 1 /T K = 1.0. The time-dependent tunnel inner boundaries, which simulate the real across-section excavation process as center drift advanced method (Miura et al 2003) (e.g., method C shown in Fig. 15), and drilling and blasting method (Tonon 2010) (e.g., methods A, B1 and B2 shown in Fig.…”
Section: Influence Of the Excavation Ratementioning
confidence: 99%
See 2 more Smart Citations
“…In this section, the final values of the major and minor axes and the ratio of horizontal over vertical stresses k are the same as in the previous section with the end time of excavation being t 1 /T K = 1.0. The time-dependent tunnel inner boundaries, which simulate the real across-section excavation process as center drift advanced method (Miura et al 2003) (e.g., method C shown in Fig. 15), and drilling and blasting method (Tonon 2010) (e.g., methods A, B1 and B2 shown in Fig.…”
Section: Influence Of the Excavation Ratementioning
confidence: 99%
“…Therefore, proper simulation of the whole sequence of excavation is of great importance for the determination of the optimal values of the tunneling parameters to achieve optimal design (Tonon 2010;Sharifzadeh et al 2012). Sequential excavation is a technique becoming increasingly popular for the excavation of tunnels large cross-section in several countries (Tonon 2010;Miura et al 2003). For instance, 200 km of tunnels along the new Tomei and Meishin expressways in Japan, were built via the so-called center drift advanced method.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The whole working face of each tunnel is divided into two parts, first the upper part is headed, and then the lower part: The circled digits in Fig. 8 represent the tunneling sequence of the surrounding rock within the tunnel contour by conventional tunneling method [18][19][20]. The longitudinal profile of the tunnel construction process is shown in Fig.…”
Section: Construction Procedures Of the Ultra-shallow Tunnelmentioning
confidence: 99%
“…The final permanent support system is commonly a cast-in-place concrete lining, placed over a waterproofing membrane. Tunnel stability, ground displacements induced by tunneling, and the performance of the support system, are some of the issues that must be taken into consideration for the successful design and implementation of a NATM tunnel [1]. The ground movements, induced by tunneling, affect the safety of adjacent underground structures and surface buildings [2].…”
Section: Introductionmentioning
confidence: 99%