2021
DOI: 10.1007/978-981-16-1657-0_45
|View full text |Cite
|
Sign up to set email alerts
|

Study on Pollutants Control of Circulating Fluidized Bed Boiler Burning Low Calorific Value Coal

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…According to statistics, China's coal output in 2022 was 4.56 billion tons, and the washing proportion was 69.7%, of which about 90% was wet separation, and the amount of high-ash coal slime generated by wet separation was relatively large (Chen et al, 2014;Zhu, 2023). Meanwhile, the coal slime dewatering has disadvantages such as low efficiency, high treatment cost and low calorific value, and the coal preparation plants cannot directly sell coal slime and has no good treatment measures; as a result, they can only choose open storage (Wu et al, 2017;Lv et al, 2021). Therefore, the treatment, consumption and comprehensive utilization of high-ash coal slime has become an urgent problem to be solved.…”
Section: Introductionmentioning
confidence: 99%
“…According to statistics, China's coal output in 2022 was 4.56 billion tons, and the washing proportion was 69.7%, of which about 90% was wet separation, and the amount of high-ash coal slime generated by wet separation was relatively large (Chen et al, 2014;Zhu, 2023). Meanwhile, the coal slime dewatering has disadvantages such as low efficiency, high treatment cost and low calorific value, and the coal preparation plants cannot directly sell coal slime and has no good treatment measures; as a result, they can only choose open storage (Wu et al, 2017;Lv et al, 2021). Therefore, the treatment, consumption and comprehensive utilization of high-ash coal slime has become an urgent problem to be solved.…”
Section: Introductionmentioning
confidence: 99%