2015
DOI: 10.1016/j.omega.2015.01.005
|View full text |Cite
|
Sign up to set email alerts
|

Subcontracting price schemes for order acceptance and scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(6 citation statements)
references
References 20 publications
0
6
0
Order By: Relevance
“…Substituting Equations ( 18)-( 21) and ( 22)-(24) into Equations ( 12) and (13) shows that the optimal profit of the retailers and manufacturers under the decentralized decision scenarios is 25) and ( 26), the overall optimal profit of the supply chain under the decentralized decision is…”
Section: βmentioning
confidence: 99%
See 1 more Smart Citation
“…Substituting Equations ( 18)-( 21) and ( 22)-(24) into Equations ( 12) and (13) shows that the optimal profit of the retailers and manufacturers under the decentralized decision scenarios is 25) and ( 26), the overall optimal profit of the supply chain under the decentralized decision is…”
Section: βmentioning
confidence: 99%
“…Cai et al [12] researched a variety of dual-channel supply chain structures and designed a price contract to enable the coordination of multiple dual channels. Wang et al [13] designed a fixed pricing and transfer payment plan, and a quantity discount pricing plan to coordinate the decisions of each member of a supply chain. Some scholars start with two-step pricing contracts in dual-channel supply chain research.…”
Section: Introductionmentioning
confidence: 99%
“…Again, problems of this kind do not include fixed time intervals for jobs and the possibility of processing the same job by in-house and third-party machines. Publications on scheduling with sub-contracting include Chen and Li [9], Qi [27], Mokhtari and Abadi [26], Zhong and Huo [36], Vairaktarakis [33], Wang et al [35], Hezarkhani and Kubiak [18], Vairaktarakis and Aydinliyim [34], Ren et al [28], and the references therein.…”
Section: Problemmentioning
confidence: 99%
“…Wang et al investigated the problem of timing and acceptance of the order with the possibility of outsourcing in a few modes. The objective function is equal to accepted order minus the cost of outsourcing [5]. Lu et al presented the accurate polynomial time algorithm for optimal solution of scheduling problem and of rejecting the order in a single machine mode [6].…”
Section: Literature Reviewmentioning
confidence: 99%