All Days 2012
DOI: 10.2118/156892-ms
|View full text |Cite
|
Sign up to set email alerts
|

Successful Use of Managed Pressure Drilling (MPD) in Low Pressure, High Pressure, and Deeper Reservoirs in Mexico South

Abstract: Proper planning and front-end engineering, in a Biphasic MPD operation to drill a high temperature depleted reservoir in Mexico south area, demonstrated the real added value of the Constant Bottom Hole Pressure (CBHP) technique to overcome risks associated with a nuisance gas zone, hole cleaning and geo-mechanic issues which caused the loss of the original 5 7/8?? hole by failure of the BHA during a pipe work operation in tight hole. Annular velocity is considered as the most critical factor aff… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…are widely used now, but few of them could be used in MPD due to the extremely atrocious working conditions (high temperature, high pressure, and mud erosion) [6,7].…”
Section: Introductionmentioning
confidence: 99%
“…are widely used now, but few of them could be used in MPD due to the extremely atrocious working conditions (high temperature, high pressure, and mud erosion) [6,7].…”
Section: Introductionmentioning
confidence: 99%