Surge Test-Based Identification of Stator Insulation Component With Partial Discharge Activity for Low Voltage AC Motors

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
10
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 23 publications
(11 citation statements)
references
References 23 publications
1
10
0
Order By: Relevance
“…In the context of investigations on LV machines, imitations of the insulation system in the form of wire pairs according to the standard IEC60851-5 [48], so-called motorettes/formettes (single-or three-phase) [90], [92], [119], [143]- [145] and rarely -due to the associated high costs -complete stators are used as test specimens [119], [146]- [148]. Many contributions concentrate on the component level of the materials used and other manufacturing parameters [44], [47], [91].…”
Section: E Measurement Test Setup and Specimenmentioning
confidence: 99%
“…In the context of investigations on LV machines, imitations of the insulation system in the form of wire pairs according to the standard IEC60851-5 [48], so-called motorettes/formettes (single-or three-phase) [90], [92], [119], [143]- [145] and rarely -due to the associated high costs -complete stators are used as test specimens [119], [146]- [148]. Many contributions concentrate on the component level of the materials used and other manufacturing parameters [44], [47], [91].…”
Section: E Measurement Test Setup and Specimenmentioning
confidence: 99%
“…(37) and (38) define the status of the switched lines in the initial network topology. Constraints (39) and (40) prevent each line in the set Ω from changing its status more than once through all the stages. Constraint (41) models the correlation between the lines defined for the switching exchange.…”
Section: B Optimal Transitional Droops For a Single Line-openingmentioning
confidence: 99%
“…For each droop technique, the lineopening operation is performed using two droop settings: the first one achieves proportional load sharing (PLS) among the DGs, and the second setting is the optimized transitional droops (OTD) that minimize the power flow in the switched line. To evaluate the severity of the produced voltage transient, the peak of the surge voltage (PSV) [39], [40] accompanying the lineopening operation is recorded for each droop technique and setting. Since the steady-state values of the voltage before and after performing the switching operation are different due to the change in the loading of the droop-controlled DGs, the PSV is measured relative to the steady-state value of the voltage after executing the line opening operation as clarified in Fig.…”
Section: A Assessment Of the Voltage Transient Improvement For A Single Line-switching Operationmentioning
confidence: 99%
“…nsulation related problems represent one the main causes leading to premature failures in electrical machines. The adoption of modern variable speed drives has been widely recognised, by the scientific community, as one of the primary reasons of machines' insulation over-stress [1][2][3]. The combination of fast switching devices (i.e.…”
Section: Introductionmentioning
confidence: 99%
“…This means that a precise understanding of the insulation system's behaviour in terms of PD inception during actual operation is crucial for guaranteeing the simultaneous fulfilment of reliability and power density constraints. Various investigations have been carried out on PD analysis for insulation systems of Type-I machines [2,8,9], although only few of them refer to motors for aerospace applications [10][11][12]. In [10], an innovative 'contactless' PD detection method for machines' insulation is proposed, and its suitability is verified in a representative aerospace environment, down to 100 mbar pressure.…”
Section: Introductionmentioning
confidence: 99%