Survey of Power System Restoration Documents Issued from 2016 to 2021

Abstract: More than thirty-six partial or whole blackouts, from 2016 to 2021, prove that neither the probability of blackouts can be ignored nor the required plans and the readiness of the utilities for power system restoration can be forgotten. To properly deal with blackouts and minimize the social and economic costs, utilities should prepare a suitable restoration plan in advance to quickly restore the system to the normal state and minimize the restoration time and loss of energy. In this paper, after summarizing ma… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 71 publications
0
1
0
Order By: Relevance
“…For these reasons, performing black start mock drills is very important for the Transmission System Operators (TSOs), together with the definition of proper black start standards, such as [1,2]. These mock drills allow for the testing of all the power system equipment and the restoration strategies to guarantee a fast recovery in case of extended outages [3,4].…”
Section: Introduction 1motivationsmentioning
confidence: 99%
“…For these reasons, performing black start mock drills is very important for the Transmission System Operators (TSOs), together with the definition of proper black start standards, such as [1,2]. These mock drills allow for the testing of all the power system equipment and the restoration strategies to guarantee a fast recovery in case of extended outages [3,4].…”
Section: Introduction 1motivationsmentioning
confidence: 99%