2023
DOI: 10.1016/j.jcsr.2023.108124
|View full text |Cite
|
Sign up to set email alerts
|

Sustainable approaches to improve the resilience of modular buildings under wind loads

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 48 publications
0
1
0
Order By: Relevance
“…The PVMB system can be defined as a construction practice wherein most of the on-site work is shifted to factories. In the PVMB system, 3-D modules, or the building units with the structural elements, MEP (mechanical, electrical, and plumbing) services, and finishes are manufactured in the factories and then transported to the required location [17]. To complete the structure, assembly and installation are carried out on-site (refer to Figure 2).…”
Section: Introductionmentioning
confidence: 99%
“…The PVMB system can be defined as a construction practice wherein most of the on-site work is shifted to factories. In the PVMB system, 3-D modules, or the building units with the structural elements, MEP (mechanical, electrical, and plumbing) services, and finishes are manufactured in the factories and then transported to the required location [17]. To complete the structure, assembly and installation are carried out on-site (refer to Figure 2).…”
Section: Introductionmentioning
confidence: 99%