Proceedings of the 2011 International Conference on Electrical Engineering and Informatics 2011
DOI: 10.1109/iceei.2011.6021652
|View full text |Cite
|
Sign up to set email alerts
|

Switching study for 275 kV Padang Sidempuan - Payakumbuh transmission line

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…The power system frequency is operated by PLN at 50 Hz for all Indonesia regions. The 150 kV Sumatra power system is divided into two significant subsystems, the North Sumatra subsystem and the Mid-South Sumatra subsystem [25,26]. The North Sumatra subsystem is composed of two smaller subsystems, i.e., Aceh and Sumut subsystems.…”
Section: Indonesia's Transmission Power Systemmentioning
confidence: 99%
“…The power system frequency is operated by PLN at 50 Hz for all Indonesia regions. The 150 kV Sumatra power system is divided into two significant subsystems, the North Sumatra subsystem and the Mid-South Sumatra subsystem [25,26]. The North Sumatra subsystem is composed of two smaller subsystems, i.e., Aceh and Sumut subsystems.…”
Section: Indonesia's Transmission Power Systemmentioning
confidence: 99%