Different systems of stratal flooding by mineral or fresh water into oil bearing formation are used today to enhance reservoir recovery. At low temperatures, 25 degrees below zero and lower, there is a great possibility of freezing of the well head equipment due to cyclic flooding or separate horizontal flooding, lessening injection capacity of the well, emergency stops in flooding, due to water pipe breakage or power cutting off. Besides the wells, crossover bends from water injection wells to the pipe header, and stagnation zones of the embedded in grooves pipes can freeze. According to expert estimation of PJSC "Tatneft" specialists, the amount of frozen injection stations is more than 500 wells per year. Due to the urgency of the issue technological measures have been developed to prevent oil-field equipment freezing.