: New design concept of Reactor Coolant System (RCS) including a reactor assembly for the SMR is introduced in this work. An exploration of new type of reactor that is advanced from proposed SMRs is performed by using systems engineering approach. In this point of view project structured on three main phases; needs analysis (NA), concept exploration (CE), and concept definition (CD). Main objectives as an output of the CE stage are a small size, low cost, shortening the schedule, and enhancing safety. The SMRs usually have a small size requirement. In order to meet the size requirement and to achieve a productivity, in other words, easiness to manufacture, this paper suggests an integrated PWR design concept through researching predecessors. Although the integrated PWR concept provides many advantages, it has disadvantages that composite of maintenance and a low availability problem. Therefore, this paper comes up with a run-to-fail design concept based on modular design to address the maintenance problem and to maximize the availability of SMRs as well as to be compatible with the overall-SMRs including Barge Mounted(BM)type.