“…If the robots need to be deployed in the environment the schedule determined by Algorithm 1 (d) Figure 9: Two steps of the tree generation of Algorithm 3. First, the path in G starting from 27 is considered (bold edges in Figure 9a), which results in the path (2,7,3,6,5) in G and the directions d 7 = d 6 = cw, d 3 = d 5 = ccw (bold lines in Figure 9c). Next, the path starting at 14 is considered (Figure 9b), which results in the path (1,4,3,5) in G. Since 3 is already in the tree, only the branch (1, 4, 3) with d 4 = ccw is added (Figure 9c, the dashed line indicates the discarded part of the path).…”