2022
DOI: 10.1007/978-3-030-96380-4_26
|View full text |Cite
|
Sign up to set email alerts
|

Technical and Economic Efficiency of Intelligent Data Analysis on the Railways of the Uzbekistan Republic

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 15 publications
0
1
0
Order By: Relevance
“…An analysis of the operation of diesel locomotives 2TEI16 and type TE10 over many years has shown that the stage switching system is often unstable [10][11]. The main reason is the converging (non-parallel) lines of the switching diagram, which, in turn, are due to the converging lines of switching on and off the transition relay RD-3010.…”
Section: Introductionmentioning
confidence: 99%
“…An analysis of the operation of diesel locomotives 2TEI16 and type TE10 over many years has shown that the stage switching system is often unstable [10][11]. The main reason is the converging (non-parallel) lines of the switching diagram, which, in turn, are due to the converging lines of switching on and off the transition relay RD-3010.…”
Section: Introductionmentioning
confidence: 99%