Wind Energy Management 2011
DOI: 10.5772/21281
|View full text |Cite
|
Sign up to set email alerts
|

Technical Framework Conditions to Integrate High Intermittent Renewable Energy Feed-in in Germany

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2014
2014

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…The up scaled 13. 4 TWh from PV are based on 16.8 GW installed PV power and correspond to about 800 h of full load or to a capacity factor of 9%. The operation of the Alpha Ventus wind farm for a full year would have yielded 0.203 TWh for the 60 MW installed power.…”
Section: -Starting Data Of 2010mentioning
confidence: 99%
“…The up scaled 13. 4 TWh from PV are based on 16.8 GW installed PV power and correspond to about 800 h of full load or to a capacity factor of 9%. The operation of the Alpha Ventus wind farm for a full year would have yielded 0.203 TWh for the 60 MW installed power.…”
Section: -Starting Data Of 2010mentioning
confidence: 99%