2017
DOI: 10.1515/pomr-2017-0033
|View full text |Cite
|
Sign up to set email alerts
|

Technical Monitoring System for a New Part of Gdańsk Deepwater Container Terminal

Abstract: Development strategy for the port of Gdańsk assumes that , up to 2027, it

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
7
1

Relationship

3
5

Authors

Journals

citations
Cited by 21 publications
(14 citation statements)
references
References 18 publications
0
14
0
Order By: Relevance
“…No monitoring system was designed to control the slope, despite the instability that was observed since 1989 and the uncertain design conditions. Probably, long-term monitoring of the slope would have redounded to the benefit of risk mitigation [34,35]. In 2011, the Alcoy City Council was alerted that an industrial building located at the toe of the slope was affected by a landslide.…”
Section: Geological Settings and History Of The Slopementioning
confidence: 99%
See 1 more Smart Citation
“…No monitoring system was designed to control the slope, despite the instability that was observed since 1989 and the uncertain design conditions. Probably, long-term monitoring of the slope would have redounded to the benefit of risk mitigation [34,35]. In 2011, the Alcoy City Council was alerted that an industrial building located at the toe of the slope was affected by a landslide.…”
Section: Geological Settings and History Of The Slopementioning
confidence: 99%
“…have redounded to the benefit of risk mitigation [34,35]. In 2011, the Alcoy City Council was alerted that an industrial building located at the toe of the slope was affected by a landslide.…”
Section: Geological and Geotechnical Characterizationmentioning
confidence: 99%
“…The location of monitoring sensors installed on a micropile is highlighted in red in Figure 7. The development and set-up of the monitoring system, calibration of the sensors in laboratory and the assembly of the equipment on site has been described in detail by Miśkiewicz et al [10]. The observations on site continued in varying weather conditions for over 500-days (Fig.…”
Section: Technical Monitoringmentioning
confidence: 99%
“…Structural health monitoring systems are nowadays commonly used to confirm theoretical assumptions made in design phase [3][4][5][6][7]. The main purpose of the SHM system here was to ensure the safety of visitors by initiation of emergency procedures in case of dangerous near-failure states that might lead to the total collapse.…”
Section: Introductionmentioning
confidence: 99%