2022
DOI: 10.46855/energy-proceedings-8624
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

Techno-Economic Assessment of Wind Farm Repowering: A case Study of Zafarana Station, Gulf of Suez, Egypt

Abstract: The Zafarana wind farm was commissioned on phases since 2001 till 2010 with a total installed capacity of 545 MW.The development of the plant was not optimum, as some late phases was developed upstream of earlier one and the site utilization was not optimized as one plot. The wind farm is located at the Gulf of Suez, an area with abundant wind resource and strong infrastructure. Therefore, repowering scenario was favored over decommissioning or revamping as it enables to exploit and optimize the wind resource … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 12 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?