Techno‐economic feasibility study of autonomous hybrid wind and solar power systems for rural areas in Iran, A case study in Moheydar village

Abstract: In this research, a feasibility study of using a small wind turbine as an integrated system with a solar photovoltaic system and a diesel generator was performed using the HOMER® optimization model. For this purpose three main scenarios have been taken into account. In the first two scenarios the diesel price was considered 0.8 $/L (Scenario 1) and 1.5 $/L (Scenario 2) and no limits were assumed for emissions of diesel generator. The most efficient system in the first scenario consists of one wind turbine (15 … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
10
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 36 publications
(10 citation statements)
references
References 18 publications
0
10
0
Order By: Relevance
“…The system consisting of 2.57 MW PV, 4.14 MWh of pumped hydro storage and 1.16 MWh of fuel cell have a levelized cost of 0.181 USD/kWh. The optimal configuration of solar‐wind hybrid system that is more economically viable for Iran has been determined by Atael et al is 75 kW diesel generator, 75 kW wind turbine, and 21 kW photovoltaic array. Farahi and Fazelpour determined the levelized tariff for hybrid system for residential, public, and commercial buildings in Iran.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The system consisting of 2.57 MW PV, 4.14 MWh of pumped hydro storage and 1.16 MWh of fuel cell have a levelized cost of 0.181 USD/kWh. The optimal configuration of solar‐wind hybrid system that is more economically viable for Iran has been determined by Atael et al is 75 kW diesel generator, 75 kW wind turbine, and 21 kW photovoltaic array. Farahi and Fazelpour determined the levelized tariff for hybrid system for residential, public, and commercial buildings in Iran.…”
Section: Introductionmentioning
confidence: 99%
“…To increase the reliability and generation capacity, hybrid power plants are now being developed. 14 optimal configuration of solar-wind hybrid system that is more economically viable for Iran has been determined by Atael et al 16 is 75 kW diesel generator, 75 kW wind turbine, and 21 kW photovoltaic array.…”
Section: Introductionmentioning
confidence: 99%
“…T %,f$] C 1 j/k (14) If the roughness is strong, the behavior behaves as hydraulically rough and we have, for a higher value of Y Figure 4. The roughness of different materials used as piping is presented in Table 3.…”
Section: Head Losses In the Pipementioning
confidence: 74%
“…Various studies have been developed with the final aim of assessing and comparing the performance of different types of PV modules and technologies in specific geographical locations and under various climatic conditions. [10][11][12][13] These studies can help to take economical decisions [14,15]. Optimum standalone PV system sizing process is mainly depending on meteorological data such as solar radiation and ambient temperature.…”
Section: Introductionmentioning
confidence: 99%
“…,10,11,17,21-24,26-33,35,37,39-41,43-55,57-63,65-70,72-75,77- 84,86-89,92-97,99,101-108,110,111,113-116,118,120-134,136-151, 153,154,157-159,161,164-181,183-187,189-199,201-203,205,206,208, 211-215,217,218,220-230,232-235] Financing conditions[10,11,19,21,23,28-32,34,38,40,41,43,44,47,50,51,53,55,59,64,65,67-69, 76-78,82,85-90,94,96,98,100,101,103-105,113,115,116,121-123,125-127,133,134,136-141,143,145-147,154,162,164,166,167,170,173,174, 178-181,185,189,192,194,196-198,201-203,206,209-211,213,215,219, 226,228,233] 98 Discount rate [4,10,19,21-23,25,26,28-30,33-35,37,38,40,41,43,46-51,53,57,59,60, 63-70,73,76-78,80,83,85-90,93,97-99,103,105-108,110,111,114-120, ,10,11,21,23-25,29-31,40,41,43,47,50,53,56-59,61,63,64,67,72-74, 76-81,83-88,91,92,94,97,101,103,105,107,111,114,115,119,121-126, 130-134,136-143,[145][146][147][148][149][150][152][153][154][156][157][158]162,[164][165][166][167][168][169][170][171][172][173][174][175][176][177][178][179][180]183,185,186,[189][190][191][192]194,…”
mentioning
confidence: 99%