2017
DOI: 10.1016/j.proeng.2017.02.358
|View full text |Cite
|
Sign up to set email alerts
|

Technological Problems Regarding the Design and Execution of the New Bridge Over Cibin River in the City of Sibiu and the Bridge Impact in Reducing Pollution in the City Center Area

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Figure 8.a presents an arch steel bridge crossing the Someș River in the city of Cluj-Napoca [9], for which a feasibility study was performed and Fig. 8.b shows the bridge over the Cibin river in the city of Sibiu, in service now [2], [3]. For these bridges the solution of connecting with end plates and cover plates at the tensed upper flange was used.…”
Section: Conclusion and Design Recommendationsmentioning
confidence: 99%
“…Figure 8.a presents an arch steel bridge crossing the Someș River in the city of Cluj-Napoca [9], for which a feasibility study was performed and Fig. 8.b shows the bridge over the Cibin river in the city of Sibiu, in service now [2], [3]. For these bridges the solution of connecting with end plates and cover plates at the tensed upper flange was used.…”
Section: Conclusion and Design Recommendationsmentioning
confidence: 99%