Abstract:The high-drainage roadway construction face of the working face is used to pre-drill the borehole under the tunneling face, and the problem of poor water return in the hole is solved by grouting the surrounding rock cracks in the deep and shallow holes of the drill floor. The “two plugs and one note” sealing method was adopted to ensure that the sealing holes were tight and airtight; the water pipes were blown all the way in the hole, and the single hole, grouping and timed water blowing work targets were real… Show more
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.