2021
DOI: 10.1051/e3sconf/202124501021
|View full text |Cite
|
Sign up to set email alerts
|

Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area

Abstract: The high-drainage roadway construction face of the working face is used to pre-drill the borehole under the tunneling face, and the problem of poor water return in the hole is solved by grouting the surrounding rock cracks in the deep and shallow holes of the drill floor. The “two plugs and one note” sealing method was adopted to ensure that the sealing holes were tight and airtight; the water pipes were blown all the way in the hole, and the single hole, grouping and timed water blowing work targets were real… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles