2018
DOI: 10.1007/s10836-018-5734-9
|View full text |Cite
|
Sign up to set email alerts
|

Test and Reliability in Approximate Computing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
5
2
1

Relationship

3
5

Authors

Journals

citations
Cited by 23 publications
(6 citation statements)
references
References 35 publications
0
6
0
Order By: Relevance
“…Studies focusing on the reliability of ACC are few. A number of scholars [22,23] have emphasized the necessity of reliability analysis for ACCs, but their research is not extensive. Reference [24] selected an error-tolerant application, i.e., H.264/AVC decoder, to evaluate fault criticality in different modules and in the same modules.…”
Section: Related Workmentioning
confidence: 99%
“…Studies focusing on the reliability of ACC are few. A number of scholars [22,23] have emphasized the necessity of reliability analysis for ACCs, but their research is not extensive. Reference [24] selected an error-tolerant application, i.e., H.264/AVC decoder, to evaluate fault criticality in different modules and in the same modules.…”
Section: Related Workmentioning
confidence: 99%
“…In fact, the normal lifetime of miniaturized ICs is more and more reduced [30]. Approximate computing aims at transforming this problem into an opportunity [3]. The basic idea is to "embrace" errors as an intrinsic property of ICs and systematically design optimized approximate circuits functioning regardless of errors.…”
Section: Towards Approximate-computing-based Reliable Hardwarementioning
confidence: 99%
“…These circuits are referred to as Approximate Integrated Circuits (AxICs). Since approximating circuits alters their functional behavior, techniques to test them must be revisited [49,50,39,38,37,2,36,40,41,42,4]. As a matter of fact, extending the basic testing concepts to AxICs is not straightforward.…”
Section: Approximate Integrated Circuits Testing Phasementioning
confidence: 99%