2005
DOI: 10.1108/14714170510815267
|View full text |Cite
|
Sign up to set email alerts
|

The application of GIS to construction labour market planning

Abstract: 2005),"A GIS-based site selection system for real estate projects", Access to this document was granted through an Emerald subscription provided by emerald-srm: 463575 [] For AuthorsIf you would like to write for this, or any other Emerald publication, then please use our Emerald for Authors service information about how to choose which publication to write for and submission guidelines are available for all. Please visit www.emeraldinsight.com/authors for more information. About Emerald www.emeraldinsight… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2009
2009
2022
2022

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…Moreover, the penalty cost can also be used in a case where the proposed alignment does not meet the specified project requirements, such as the minimum curve length or angles. Equation (8) expresses the penalty cost.…”
Section: Penalty Costmentioning
confidence: 99%
“…Moreover, the penalty cost can also be used in a case where the proposed alignment does not meet the specified project requirements, such as the minimum curve length or angles. Equation (8) expresses the penalty cost.…”
Section: Penalty Costmentioning
confidence: 99%
“…The importance of ensuring construction quality was also emphasised by Chew and Tan (2004) for improving the maintenance of wet areas. This seems to be significant given the current acute skills shortage in the industry fuelled by sustained regional growth, which contributes to the depletion of build quality (Dainty et al, 2004;Anumba et al, 2005). Though bathroom modules should have superior embedded quality than traditional in situ bathrooms as the modules are manufactured in factory-controlled conditions, the workmanship for their installation and repairs should be guaranteed.…”
Section: Strategies For Improving Maintenance Performance Of Offsite Bathroomsmentioning
confidence: 99%