IABSE Symposium, Nantes 2018: Tomorrow’s Megastructures 2018
DOI: 10.2749/nantes.2018.s18-1
|View full text |Cite
|
Sign up to set email alerts
|

The Challenges of a Cyclonic Region for the Construction of a Viaduct with a Launching Girder

Abstract: <p>The construction of the viaduct of the Nouvelle Route du Littoral (NRL) connecting Saint-Denis to La Grande Chaloupe in La Reunion is particularly challenging in terms of wind environment. In addition to being built in a cyclonic region, the 5.4 km long viaduct is being built in open sea, at 100 to 150 meters from the coast. The gust wind speed can go up to 64 m/s at deck level during a cyclone event. The height (10 meters) and length (270 meters) of the double truss launching girder makes it particul… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles