“…However, several uncertainty sources potentially affect the inundation model results and, consequently, decision-making [109]. In dam-break analysis, such uncertainty sources, which include the breaching mechanism, the breach width, the breaching duration, and the reservoir level at the breach time, must be considered in the definition of dam-break scenarios [47,110].…”