The economic efficiency of attracting CHPPs to cover the variable zone of daily electrical load schedules was investigated. The estimation of resource and economic performance of combined -cycle HPPs using the example of PGU-450T taking into account equipment wear under different operating conditions in the daily and weekly sections and different composition of the operating equipment has been performed and optimal load regimes have been determined.