2018
DOI: 10.1016/j.jclepro.2018.03.011
|View full text |Cite
|
Sign up to set email alerts
|

The engineering, economic, and environmental performance of terminal blend rubberized asphalt binders with wax-based warm mix additives

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

1
11
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 82 publications
(12 citation statements)
references
References 21 publications
1
11
0
Order By: Relevance
“…Furthermore, effects of WMA additives on bitumen characteristics were extensively studied in literature [12,[22][23][24][25][26][27][28][29]. These studies provide a good basis to understand the effects of WMA additives on bitumen characteristics.…”
Section: Introductionmentioning
confidence: 99%
“…Furthermore, effects of WMA additives on bitumen characteristics were extensively studied in literature [12,[22][23][24][25][26][27][28][29]. These studies provide a good basis to understand the effects of WMA additives on bitumen characteristics.…”
Section: Introductionmentioning
confidence: 99%
“…The first stage is mixing rubber powder and aggregate and then adding asphalt to produce a rubber-modified asphalt mixture [ 5 , 6 ]. The second stage is mixing asphalt + rubber powder + rubber oil, stirring in a tank at a temperature of 180 to 200 °C for about 40 to 60 min, then mixing with aggregate to produce a rubber-modified asphalt mixture [ 7 ]. The third stage involves factory-based stabilized rubberized asphalt, asphalt + rubber powder, stirred at the specified temperature and time and then added to the product tank when the product standard is reached [ 2 , 8 ].…”
Section: Introductionmentioning
confidence: 99%
“…Most of the manufacturing process of asphalt rubber is on-site production, and a sufficient working surface must be added at the construction site to complete the production of asphalt rubber [ 19 , 20 ]. If the project volume is not large, there is the risk of producing a large amount of waste, which is also an obstacle to the promotion of rubberized asphalt—underdeveloped construction and workability [ 3 , 7 , 15 ]. Because rubber-modified asphalt’s viscosity is too large, the workability of construction is a deviation, and the amount of rubber powder is not high [ 16 , 21 ].…”
Section: Introductionmentioning
confidence: 99%
“…However, there are some disadvantages to using Sasobit as a warming agent. First, it will weaken the low-temperature crack resistance of PAM, which will cause the premature failure of the mixture in cold regions [14,15]. Moreover, the application of Sasobit greatly increases the cost of the mixture.…”
Section: Introductionmentioning
confidence: 99%