“…Numerous scholars have studied the pile foundation settlement caused by shield tunnelling through analytical analysis, laboratory tests and numerical simulations. Hu et al (2021) proposed a simplified calculation method to analyse the impact of shield excavation on adjacent pile foundations. A two-stage method of modified Peck formula and Winkler elastic foundation model was used to investigate the additional displacement and internal force of pile; Basile (2014) proposed an efficient analysis method is presented for estimating the effects induced by tunnelling on existing pile foundations; Lee and Jacobsz (2006) studied the effects of tunnelling on an existing pile constructed in weathered Abbreviations: q 1 , additional thrust inside the cutter head (kPa); q 2 , additional thrust outside cutter head (kPa); f 1 , inner shield friction resistance (kPa); f 2 , outer shield friction (kPa); p, additional grouting pressure (kPa); R, cutter radius (m); K, foundation reaction modulus (MPa); G c , stiffness of the shear layer (MPa); EI, bending stiffness of the pile; E s , elastic modulus of soil (MPa); R 0 , turning radius (m); L, shield length (m); µ, Poisson's ratio; g, formation loss parameter (m); H, depth of the cutter head (m); G, shear modulus of the soil (MPa); IGST, integrative gap at the shield tail; OG, over-cutting gap; D, diameter of the pile (m), t, the thickness of the shear layer (m).…”