2006
DOI: 10.1016/j.fusengdes.2005.09.008
|View full text |Cite
|
Sign up to set email alerts
|

The European test blanket module systems: Design and integration in ITER

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
20
0

Year Published

2006
2006
2025
2025

Publication Types

Select...
7
2

Relationship

2
7

Authors

Journals

citations
Cited by 31 publications
(20 citation statements)
references
References 9 publications
0
20
0
Order By: Relevance
“…The layout of the meandering channels is described in [8] for the solid breeder blanket concept. It is analogous in the HCLL blanket [9].…”
Section: Hcll Tbm Descriptionmentioning
confidence: 99%
“…The layout of the meandering channels is described in [8] for the solid breeder blanket concept. It is analogous in the HCLL blanket [9].…”
Section: Hcll Tbm Descriptionmentioning
confidence: 99%
“…The Helium-Cooled-Pebble-Bed Test Blanket Module (HCPB TBM) developed at Karlsruhe Institute of Technology (former Forschungszentrum Karlsruhe) is one of two blanket concepts chosen in the Frame of the European Blanket Program as a DEMO relevant blanket [1]. This blanket module has as outer boundary a Helium cooled steel structure named the First Wall (FW).…”
Section: Introductionmentioning
confidence: 99%
“…It belongs to Liquid Breeder blanket family for which each of the seven ITER Parties envisages DEMO-relevant TBM testing in ITER [1]. Since it is expected to install the HCLL-TBMs systems on day one of ITER operations, the development of designs and related R&D are intensively running since several years in the various EURATOM associations under the coordination of EFDA [2][3][4]. The following sections give an overview of the recent developments performed for the HCLL-TBM concept, including its integration in the ITER machine.…”
Section: Introductionmentioning
confidence: 99%