World Environmental and Water Resources Congress 2008 2008
DOI: 10.1061/40976(316)247
|View full text |Cite
|
Sign up to set email alerts
|

The Folsom Dam Auxiliary Spillway Physical Model Study as a Design Tool

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In 1995, a broken spillway also caused flooding downstream (NRC 1995). In 2004 the Folsom Dam was raised by seven feet (Mishra et al, 2008). By 2005, the Sacramento Area Flood Control Agency had raised and strengthened about 85% of the levees at the lower American River.…”
Section: Period 3: Intense Urbanization Flood Protection and Energy P...mentioning
confidence: 99%
“…In 1995, a broken spillway also caused flooding downstream (NRC 1995). In 2004 the Folsom Dam was raised by seven feet (Mishra et al, 2008). By 2005, the Sacramento Area Flood Control Agency had raised and strengthened about 85% of the levees at the lower American River.…”
Section: Period 3: Intense Urbanization Flood Protection and Energy P...mentioning
confidence: 99%