2018
DOI: 10.1016/j.jclepro.2018.08.190
|View full text |Cite
|
Sign up to set email alerts
|

The hindrance to using prefabrication in Hong Kong's building industry

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

3
122
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 107 publications
(125 citation statements)
references
References 42 publications
3
122
0
Order By: Relevance
“…A construction enterprise's satisfaction with PC is mainly affected by time, cost and productivity. However, construction companies are unwilling to adopt PC techniques because of high capital costs, difficulties in achieving economies of scale, immature production of prefabricated components, enterprise culture of avoiding risks [14,15], and lack of experience in operating such projects [16]. The adoption of a conservative strategy [17] established a dynamic assembly simulation dynamic model, analyzing the factors affecting assembly progress from three levels, including inefficient quality inspection and design data conversion, asynchronous data in the industry chain, and poor collaboration among enterprises due to design changes.…”
Section: Literature Reviewmentioning
confidence: 99%
“…A construction enterprise's satisfaction with PC is mainly affected by time, cost and productivity. However, construction companies are unwilling to adopt PC techniques because of high capital costs, difficulties in achieving economies of scale, immature production of prefabricated components, enterprise culture of avoiding risks [14,15], and lack of experience in operating such projects [16]. The adoption of a conservative strategy [17] established a dynamic assembly simulation dynamic model, analyzing the factors affecting assembly progress from three levels, including inefficient quality inspection and design data conversion, asynchronous data in the industry chain, and poor collaboration among enterprises due to design changes.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The search terms included barrier, barrier-like words, design, design-like words, prefabricated buildings, and many others. However, after careful reading, only five journal articles [25][26][27][28][29][30] and two online articles were ultimately selected for their valuable content. By reviewing the previous files on three prefabricated building projects, some practical relevant content was found and recorded.…”
Section: Gt-based Barrier Identificationmentioning
confidence: 99%
“…Montali et al [25] presented a series of challenges in facade design: the intrinsic interdependence of the design process, manufacturability information challenges, and a lack of multiobjective optimization and predictive design. Zhang et al [26] summarized some hindrances to prefabrication design, including a long design time, a lack of design change flexibility, few available codes and standards, a lack of experienced designers, and the absence of management experience. Wu et al [27] listed the design-related risks in prefabricated buildings: an insufficient consideration of supply chain conditions, the insufficient experience of architects and engineers, poor interdisciplinary design coordination, and a lack of standards and codes.…”
mentioning
confidence: 99%
“…The Hong Kong Buildings Department issued a series of financial incentive policies to promote the development of prefabrication, in which the reward of gross floor area (GFA) has the greatest attraction for real estate enterprises. Based on the policy, real estate enterprises can increase the volumetric rate of their projects to gain additional GFA if they adopt prefabricated construction methods, such as non-structural external walls [65]. Strengthening government financial incentives can increase the enthusiasm of real estate enterprises to implement prefabrication.…”
Section: Moderating Roles Of Reputational Incentives and Financial Inmentioning
confidence: 99%