Proceedings of SPE Middle East Oil and Gas Show and Conference 2007
DOI: 10.2523/105362-ms
|View full text |Cite
|
Sign up to set email alerts
|

The Identification of Condensate Banking With Multiphase Flowmeters—A Case Study

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractThe identification of condensate banking has always been a challenge. Furthermore, large productivity losses can result from the absence of early detection of a condensate bank in the near well bore area of the well. The traditional means of detecting a condensate bank range from comparison of the dew point to downhole pressure measurements, identification of composite radial models and quantification of skin using pressure transient analysis. One of the meth… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2007
2007
2020
2020

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…Early work about the deployment of Dual-Gamma Venturi multiphase flowmeters in the Yaburggazdobycha operating area has been presented by Theuveny, Zinchenko and Shumakov ( [5], [6]). During the production metering campaign, all the wells demonstrated some level of unstable production behaviour, which could be retrospectively inferred from small fluctuations of pressure and temperature.…”
Section: Actual Field Data and Their Validation Challengesmentioning
confidence: 99%
“…Early work about the deployment of Dual-Gamma Venturi multiphase flowmeters in the Yaburggazdobycha operating area has been presented by Theuveny, Zinchenko and Shumakov ( [5], [6]). During the production metering campaign, all the wells demonstrated some level of unstable production behaviour, which could be retrospectively inferred from small fluctuations of pressure and temperature.…”
Section: Actual Field Data and Their Validation Challengesmentioning
confidence: 99%
“…The importance to manage differently the multiphase well testing operation in the gas environment gas been illustrated before (Theuveny et al [1]. The principal challenge can be summariezed as follows:…”
Section: Multiphase Wet Gas Testingmentioning
confidence: 99%
“…• Mitigation of the carry over in gas line out of conventional separator • Increasing need for high resolution of GCR measurements to determine changes in fluid properties on choke changes • Higher repeatability measurements to confirm slow trends • Circumventing hydrate formation issues downstream of surface production chokes plugging up controls in separators • Remote unmanned operations • Lowering of risk associated with well testing in gas well operations through elimination of active control systems and reduction of the volumes of pressurized hydrocarbons contained in the testing systems • Permanent monitoring requirements More of these requirements for wet gas well testing have already been presented in Theuveny et al [1]. The basics of the gas well testing with dual energy gamma -venturi multiphase flowmeters have been shown by Pinguet et al [2], Hopman et al [3] and Guiese et al [8].…”
Section: Introductionmentioning
confidence: 99%
“…• Mitigation of the carry over in gas line out of conventional separator • Increasing need for high resolution of GCR measurements to determine changes in fluid properties on choke changes • Higher repeatability measurements to confirm slow trends • Circumventing hydrate formation issues downstream of surface production chokes plugging up controls in separators • Remote unmanned operations • Lowering of risk associated with well testing in gas well operations through elimination of active control systems and reduction of the volumes of pressurized hydrocarbons contained in the testing systems • Permanent monitoring requirements More of these requirements for wet gas well testing have already been presented in Theuveny et al [1]. The basics of the gas well testing with dual energy gamma -venturi multiphase flowmeters have been shown by Pinguet et al [2], Hopman et al [3] and Guiese et al The importance to manage differently the multiphase well testing operation in the gas environment gas been illustrated before (Theuveny et al [1]. The principal challenge can be summariezed as follows:…”
Section: Introductionmentioning
confidence: 99%