fax 01-972-952-9435.
AbstractIn 2005, Kuwait Oil Company Exploration Group (KOC) began drilling KM-05, a deep directional exploration well in their West Kra Al maru (KM) field. The well was projected to TD at 16,285 feet MD. In order to intersect the reservoir fractures at the appropriate angle to enhance production potential, the well profile required drilling a 16" directional hole section. The operator considered this a significant challenge to complete the build section with a 16" PDC as it had never been attempted at a depth below 11,500 ft, but they wanted to explore the possibilities. focuses in optimizing the 16" directional section. Due to this careful planning and collaboration between the operator and service providers, the directional objective in the 16" hole section of one PDC bit run was achieved. By applying new technology the section was drilled 13 days faster than the directional offsets constructed with roller cones with an estimated savings of US$258,364.