Proceedings of the 2005 Particle Accelerator Conference
DOI: 10.1109/pac.2005.1591451
|View full text |Cite
|
Sign up to set email alerts
|

The Lansce Switchyard Kicker Project

Abstract: Until 2003, the existing configuration of the Los Alamos Neutron Scattering Center (LANSCE) switchyard did not allow simultaneous delivery of the H − beam to Lines D and X. In the late 1990's, with increased activities in Areas B and C, which serve the ultracold neutron experiments (UCN) and proton radiography (pRad), respectively, planning began to increase beam availability to all areas by installing a kicker system, dubbed the "Switchyard Kicker." The Switchyard Kicker is a system of two pulsed and two dire… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
references
References 1 publication
0
0
0
Order By: Relevance