The third generation synchrotron light source ELETTRA has been in operation since 1993. A new 2.5 GeV full energy booster injector, which will replace the existing linear injector limited to a maximum energy of 1.2 GeV is now under construction. Commissioning will start this summer [1]. The paper reports on the construction of dipole, quadrupole, sextupole and steerer magnets and on the magnetic measurement results.