2022
DOI: 10.1016/j.fusengdes.2022.113139
|View full text |Cite
|
Sign up to set email alerts
|

The pre-concept design of the DEMO tritium, matter injection and vacuum systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2025
2025

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 30 publications
(14 citation statements)
references
References 65 publications
0
6
0
Order By: Relevance
“…However, a beneficial effect of the argon source being situated in the pedestal gradient region is expected in DEMO due to the neoclassical outward drift at conditions of high pedestal ion temperature [23]. The impurity doping scheme would have to be integrated into the complete DEMO fuel cycle, which includes plasma enhancement gases like argon [24,25], and into the overall impurity seeding strategy [3,26]. Fast Ar pumping will help to reduce the less efficient radiation contribution related to Ar recycling, thus maximizing δP rad /δZ eff .…”
Section: Discussionmentioning
confidence: 99%
“…However, a beneficial effect of the argon source being situated in the pedestal gradient region is expected in DEMO due to the neoclassical outward drift at conditions of high pedestal ion temperature [23]. The impurity doping scheme would have to be integrated into the complete DEMO fuel cycle, which includes plasma enhancement gases like argon [24,25], and into the overall impurity seeding strategy [3,26]. Fast Ar pumping will help to reduce the less efficient radiation contribution related to Ar recycling, thus maximizing δP rad /δZ eff .…”
Section: Discussionmentioning
confidence: 99%
“…[104,105] The OFC, by contrast, serves to efficiently extract the bred tritium, which includes breeding blankets, and the coolant purification and tritium extraction and recovery systems. [106] Thus, the EPS, ISS, and SDS are key systems for both loops.…”
Section: D-t Fuel Cycle Of a Fusion Reactormentioning
confidence: 99%
“…Since only deuterium and tritium must be recycled, the exhaust gas must be recovered, refined, isotopically separated, and refueled to maintain the fuel efficiency. [ 106 ] The off‐gases from the torus collected in cryopumps are moved by the roughing pump into the EPS. The EPS cleans up the exhaust gas and removes plasma enhancement gases and other impurities from the hydrogen isotopes.…”
Section: Importance Of Fusion Energy Tritium Inventories and Deuteriu...mentioning
confidence: 99%
“…The fuel cycle of a fusion power plant is responsible for refueling the plasma, and for reprocessing and storing the stream coming from the plasma chamber along with all the tritiated effluents present in the plant. During the pre-concept design phase, Day et al [ 14 ] developed a novel three-loop-based architecture for the DEMO fuel cycle aiming at minimizing tritium inventory in the system, promoting a continuous operation, and avoiding hold-ups of tritium in its processes.…”
Section: The Tritium Conditioning Systemmentioning
confidence: 99%