2014
DOI: 10.1016/j.ijleo.2014.07.045
|View full text |Cite
|
Sign up to set email alerts
|

The queuing delay analysis at relay node based on cooperative GBN-ARQ protocols

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2016
2016

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…Li [14] investigates the performance of MCARQ(multicast cooperative ARQ) in wireless networks, the queue waiting time and energy efficiency of the MARQ(multicast ARQ) and MCARQ are obtained respectively. Zhang [22] sets up Markov model of packet transmission based on the character of GBN-ARQ protocol, and the delay statistics at relay node are figured out by using matrix geometric methods. Chelli et al [2] study the performance of HARQ(hybrid ARQ) with incremental redundancy over double Rayleigh channels, and evaluate the delay experienced by Poisson arriving packets.…”
Section: Related Workmentioning
confidence: 99%
“…Li [14] investigates the performance of MCARQ(multicast cooperative ARQ) in wireless networks, the queue waiting time and energy efficiency of the MARQ(multicast ARQ) and MCARQ are obtained respectively. Zhang [22] sets up Markov model of packet transmission based on the character of GBN-ARQ protocol, and the delay statistics at relay node are figured out by using matrix geometric methods. Chelli et al [2] study the performance of HARQ(hybrid ARQ) with incremental redundancy over double Rayleigh channels, and evaluate the delay experienced by Poisson arriving packets.…”
Section: Related Workmentioning
confidence: 99%