1980
DOI: 10.1147/sj.191.0081
|View full text |Cite
|
Sign up to set email alerts
|

The role of detailed simulation in capacity planning

Abstract: A number of performance prediction methods are available to IBM marketing personnel. This paper describes one such method, which predicts the effects ofchanges in IBM 3790 and 8100 distributed processing systems and in teleprocessing networks. Such changes may involve system features (such as line protocols), the introduction of new applications, or volume growth in an otherwise static system. The technique makes use ofa detailed simulator, informally called FIVE, in conjunction with a system monitor and data … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1981
1981
2016
2016

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 10 publications
0
1
0
Order By: Relevance
“…This method has been incorporated into the internal IBM system simulation analysis tools FIVE and SNAP/SHOT and is planned for installation in the internal IBM simulation tool RESQ. These simulators are described in [18], [19], and [20] respectively.…”
Section: Discussionmentioning
confidence: 99%
“…This method has been incorporated into the internal IBM system simulation analysis tools FIVE and SNAP/SHOT and is planned for installation in the internal IBM simulation tool RESQ. These simulators are described in [18], [19], and [20] respectively.…”
Section: Discussionmentioning
confidence: 99%