SPE Oil and Gas India Conference and Exhibition 2010
DOI: 10.2118/129031-ms
|View full text |Cite
|
Sign up to set email alerts
|

The Use of Wireline Formation Tester for Optimization of Conventional Well Test Design and Interpretation

Abstract: During the exploration and appraisal phases field data is collected for the determination of reservoir parameters which will govern the Field Development and production strategy. Permeability-thickness, hydrocarbon properties and reservoir extent are critical parameters acquired during this phase which are used to evaluate expected well and reservoir performance. Dynamic Flow tests, combined with Downhole Fluid Analysis and fluid samples are commonly used to obtain this information. The most common flow tests … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2019
2019

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…Moreover, without the good prior knowledge on the reservoir pressure and reservoir fluid type, the well testing may face the problems (Kumar et al 2010) including failure to flow to surface, insufficient rates to clean the formation or to lift the liquid loading or non-hydrocarbon production which resulted in non-necessary cost, time and operational risks in exploration phase. However, with such low mobility, the cost for the operation can be very high as the result of stimulation work needed before the well testing.…”
Section: Introductionmentioning
confidence: 99%
“…Moreover, without the good prior knowledge on the reservoir pressure and reservoir fluid type, the well testing may face the problems (Kumar et al 2010) including failure to flow to surface, insufficient rates to clean the formation or to lift the liquid loading or non-hydrocarbon production which resulted in non-necessary cost, time and operational risks in exploration phase. However, with such low mobility, the cost for the operation can be very high as the result of stimulation work needed before the well testing.…”
Section: Introductionmentioning
confidence: 99%