2021
DOI: 10.1109/tase.2020.3017134
|View full text |Cite
|
Sign up to set email alerts
|

The (α, β)-Precise Estimates of MTBF and MTTR: Definition, Calculation, and Observation Time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 9 publications
0
3
0
1
Order By: Relevance
“…However, a simple mean often may not be a good approximation for heavy-tailed shapes that the TTR and TTA processes can follow. In this light, they can be posed as a distribution function, not a scalar, following, typically, a log-normal or exponential distribution [43]. The implication of Eq.…”
Section: Limitationsmentioning
confidence: 99%
See 1 more Smart Citation
“…However, a simple mean often may not be a good approximation for heavy-tailed shapes that the TTR and TTA processes can follow. In this light, they can be posed as a distribution function, not a scalar, following, typically, a log-normal or exponential distribution [43]. The implication of Eq.…”
Section: Limitationsmentioning
confidence: 99%
“…In other words, the best, worst and regular analysts/working days are offsetting the estimation. Actually, the authors in [43] suggest measuring in the range of hundreds of samples to ensure the significance of MTTR estimate but, at the same time, they state that in practical cases this number may be in dozens rather than hundreds. In the case of our work, we have used a number of samples an order of magnitude above hundreds on our hands-on working experience with operations centers, this provides us with a significant estimate with narrow confidence intervals.…”
Section: Limitationsmentioning
confidence: 99%
“…An additional filter to our search was the date of publication: for the most appropriate findings, only recent (since 2017) articles were processed. As a first step of the research, requirements and indicators were collected and evaluated from the literature [29][30][31][32][33][34][35][36][37][38][39][40][41][42][43]. This input supported the authors to make AHP analyses with the use of which the importance of these components were calculated and consistency calculations carried out.…”
Section: Meta-analysismentioning
confidence: 99%
“…Untuk mengetahui MTBF dan MTTR, waktu kerja mesin perbaikan yang nyatanya tidak beraturan harus dihitung dan setelah itu dirata-rartakan untuk mengetahui nilai MTBF dan MTTR. [4] Terdapat tiga jenis distribusi yang dapat dipakai untuk menghitung nilai MTBF dan MTTR yaitu distribusi Normal, Eksponensial, dan Weibull. Distribusi Eksponensial digunakan apabila laju kerusakan komponen tidak terkait dengan umur pakai dan faktor lain dalam historis pemakaiannya, sedangkan jika laju kerusakannya tergantung pada umur pakainya maka distribusi yang digunakan adalah distribusi Normal dan Weibull.…”
Section: B Mtbf Dan Mttrunclassified